For Azerpambıq – Equipment and SCADA Monitoring System
Project name: For Azerpambıq – Equipment and SCADA monitoring system
Description:
A two-stage project was implemented for Azerpambıq Company to optimize production processes and monitor quality. The projects were implemented in a short time and delivered to the customer.
Work Done – Cabin Hopper and Double Eye Weigher Equipment
Cabin hopper and 2-bay scale equipment were manufactured and delivered to the project site.
The equipment was assembled and adjusted in the field by professional engineers.
The project was fully completed and submitted to the customer within 1.5–2 months.
Work done – SCADA Control and Monitoring System
A SCADA program has been developed that allows for centralized monitoring of temperature and humidity indicators.
Necessary goods and equipment have been purchased and provided.
The system covered the Saatli, Beylagan and Agjabedi districts.
The project was successfully completed in 1.5–2 months in 2024.
This project has enabled AzerPambiq enterprises to operate on a more sustainable and technological basis by ensuring production efficiency, quality management, and real-time monitoring of processes.