Equipment and SCADA Monitoring System Installation for IODICO Company
Project Name: Equipment and SCADA Monitoring System Installation for IODICO Company
Description:
A two-stage project was implemented for IODICO to increase the accuracy of production processes and strengthen quality control. The projects were completed and delivered to the customer in a short period of time.
Work Done – Cabin Hopper and Double Eye Weigher Equipment
Cabin hopper and 2-bay scale equipment were manufactured and delivered to the project site.
The equipment was assembled and adjusted in the field by professional engineers.
The project was fully completed and submitted to the customer within 1.5–2 months.
Work done – SCADA Control and Monitoring System
A SCADA program has been developed that allows for centralized monitoring of temperature and humidity indicators.
Necessary goods and equipment have been purchased and provided.
The SCADA system is integrated into the enterprise's existing production processes.
As a result of the project, IODICO gained operational control, precise measurements, and automated monitoring capabilities in its production environment, enabling the company to manage its operations more efficiently and sustainably.